Salty Web Co Salty
Web CoFirst In. Built Right.

Home › Website build time

Straight answer · for contractors

How long does it take to build a website? A contractor’s timeline, week by week.

What a 2026 survey of web firms found, how long each size of site takes with us, what slows a build down, and when Google finds it after launch. Then put in your start date and see when yours would be live.

Updated November 5, 2026 · timings from a 2026 survey of 300+ web firms and Google’s own help pages, every source at the bottom

Your dates

When would yours be live?

Pick the size of site and the day you’d ask, and say how many days you’d need to get us your photos and wording. It works out each date from our timings and Google’s.

Live about 12 days after you ask.

We call you back
Within 1 business day
Your free mockup
Within 3 days
You approve it and send your details
2 days after the mockup
Your site goes live
About a week after that
Google starts crawling it
A week or so after launch
Business Profile verified
Within 5 business days

Estimates, not promises. Our timings are “about”, and the build counts from the day we have your approval, photos and wording. Google says a new site can take a week or so to start being crawled and that it can’t predict or guarantee when. The Business Profile date assumes it’s started the day you approve; a postcard takes about 2 weeks to arrive first. Business days skip weekends, not holidays. Need it sooner? A one-page site can go up in 24–72 hours on a rush, for an extra fee.

Get my free mockupOr call (224) 225-9268 and ask about a rush.
By size of site

How long each kind of site takes, theirs and ours.

In April and May 2026, GoodFirms asked 300+ web firms in 31 countries how long their builds take. Here are their most common answers next to our own timings, which start once we have your approval, photos and wording.

What’s in itMost common answer, GoodFirms 2026With us
One pageYour services, job photos, a call button, a form, and your Business Profile set up2–4 weeks for a basic website (71% of firms)About a week with 1 round of revisions: The Attack Line, $1,000. Or 24–72 hours on a rush, for an extra fee
Up to 5 pagesA page for each main service, your service areas, a gallery built to sell the work2–4 weeks for a basic site; 4–8 weeks for a mid-sized one (50% of firms)About two weeks with 2 rounds: Working Fire, $2,500
8 to 10 pages, old site movedA storm damage and insurance claim page, every old address redirected, Search Console set up4–8 weeks for a mid-sized site; 32% of firms said 8–16About three weeks with 3 rounds: Second Alarm, $4,500
Online storeProducts and their options, product photos, Google Shopping set up8–28 weeks for an ecommerce siteAbout three weeks with 2 rounds: Task Force, $3,500

GoodFirms surveyed firms in 31 countries, and each one scopes a “basic” site its own way, so read it as the usual range, not a rule. The firms building with AI site builders reported the quickest jobs: about 7 in 10 within two weeks. What each size costs is in our contractor website cost guide.

Week by week

From your first call to Google finding it.

Here’s a one-page build with us, step by step. A bigger site adds a week or two to the build step; everything else is the same.

  1. Day 1: you ask

    Fill in the form or call. Your name, business and phone are enough to start, plus your current site’s link if you have one.

  2. Within one business day: we call you back

    We ask what you do, the towns you work in and what you want the phone to ring for.

  3. By day 3: your free mockup

    Your homepage, designed for your business, to look at on your own phone. You pay nothing until you approve it.

  4. Your turn: approve it and send the details

    Your logo, job photos, services and towns, reviews, and the logins to your domain and Business Profile. This is the step that sets the date, and it’s the one only you can do.

  5. About a week: we build it

    One page in about a week, with your round of revisions inside that time. Up to five pages takes about two weeks with 2 rounds; 8 to 10 pages, about three with 3.

  6. Launch day: live on your domain

    We point your domain at the new site; Netlify says that can take up to a full day to reach everyone. Then we send Google the sitemap and ask it to crawl the homepage, the first step Google recommends for a new site.

  7. The weeks after: Google finds it

    Google says a new site can take a week or so to start being crawled, and crawling can take a few days to a few weeks. Asking again doesn’t make it faster, and Google says it can’t predict or guarantee it.

Want to see yours in 3 days?We design your homepage free within 3 days. You pay nothing until you approve it.
Get my free mockup
What slows it down

Most delays aren’t the build. They’re waiting.

Six things that push a launch date back, and how to keep each one off yours.

Photos and wording

The firms in GoodFirms’ 2026 survey list content delays among the hidden costs: missing copy, images and legal text hold a project up, because nobody can build what doesn’t exist yet. Send your own job photos and your services on day one.

Too many people signing off

Every extra person who has to approve the design adds a round of waiting. Decide who signs off before it starts: in the same survey, 49% of the firms named client revisions as something that pushes a project over budget.

Logins nobody can find

The domain is in an old employee’s account, or the last designer kept the password. Find your domain login and your Business Profile access the day you ask, not the day before launch.

Adding pages halfway through

A new service page after the design is set is new work. GoodFirms puts growing scope at the top of the hidden costs its firms named. List everything you want at the start, even the pages for later.

Moving an old site

If your current site already brings calls from Google, every old address has to forward to its new page. Google says a small to medium-sized site can take a few weeks for most pages to move over, and suggests moving in a quieter stretch.

Waiting on a postcard

If your Business Profile isn’t verified yet, start now. Google says a postcard usually takes about 2 weeks to arrive and its code expires after 30 days, and its review takes up to 5 business days. If video verification is offered, Google recommends it.

Have these ready

Send these on day one and nothing waits on you.

You don’t need all of it to start: your name, business and phone are enough for the mockup. The rest sets your launch date.

  • Your logo, the original file if you have it
  • Photos of your own jobs, before and after if you have them
  • The services you want calls for, and the ones you don’t
  • The towns you work in
  • Your license and insurance details, if your trade shows them
  • Your best reviews, or the link to your Google profile
  • Your domain login, wherever your web address is registered
  • Access to your Business Profile, or the email that owns it
  • Your old site’s login, if you’re moving from one
  • Who signs off: one person who approves the design
After launch

Live isn’t the same as found. Here’s what comes after.

A site can be finished and still not show up. These clocks start at launch and belong to Google and your domain, not to us; here’s what each one’s own help pages say, and what helps.

How longWhat helps
Your domain reaches the new siteUsually hours; Netlify says it can take a full day to reach the whole internetNothing on your end once we have your domain login
Google starts crawling a new siteA week or so, Google says; crawling can take a few days to a few weeksA sitemap, and asking Google to crawl the homepage first; asking again won’t make it faster
Your old pages move to the new siteA few weeks for most pages on a small to medium-sized site, with rankings moving around meanwhileA redirect from every old address, and a quieter stretch for the switch
Your Business Profile is verifiedGoogle’s review takes up to 5 business days, and sometimes it’s instant; a postcard takes about 2 weeks to arrive firstVideo verification, if Google offers it: Google recommends it
Showing up for the searches you wantNo set time: Google says it can’t predict or guarantee when, or if, pages are crawled and indexedA page for each service, reviews coming in, and a complete Business Profile

Getting found after launch is its own job. Start with our Google Business Profile guide, or see what local SEO costs if you’d rather hand it off.

Where we come in

Build it yourself, or have it live in a week.

A website builder can be the right call if you have the evenings. Here’s what each way takes. Salty Web Co is firefighter-owned and builds for contractors.

A builder, done yourself

  • Sign up and pick a template the same day
  • Write every page and choose every photo yourself
  • Set up the domain and your Business Profile yourself
  • Your evenings, for as long as it takes
  • A monthly plan; check the price once any intro offer ends

With Salty Web Co

  • A reply within one business day and a free homepage mockup within 3 days
  • The Attack Line, one page, $1,000, live in about a week
  • Working Fire, up to 5 pages, $2,500, about two weeks; Second Alarm, 8–10 pages, $4,500, about three
  • A one-page rush launch in 24–72 hours, for an extra fee
  • Your domain pointed and your Business Profile set up for you, in English and Spanish
  • You own your website, domain and data
Website build time questions

Asked by contractors, answered straight.

How long does it take to build a website?
For a small business, usually 2 to 4 weeks: that’s what 71% of the 300+ web firms in GoodFirms’ 2026 survey said for a basic website. Half put a mid-sized site at 4 to 8 weeks, and online stores ran 8 to 28 weeks. With us, after a free mockup within 3 days, a one-page site is live in about a week, up to five pages in about two and 8 to 10 pages in about three.
How long does a contractor website take to build?
With us: a reply within one business day and a free homepage mockup within 3 days, then The Attack Line (one page) in about a week, Working Fire (up to five pages) in about two, and Second Alarm (8 to 10 pages, with your old site moved) in about three. The date mostly depends on how fast your photos, logo and wording arrive.
Can a website be built in 24 hours?
A one-page site can go up in 24–72 hours with our rush launch, for an extra fee, once we have your photos and wording. A website builder will publish a template the same day you sign up, but the writing and photos still take as long as they take.
How long does a website redesign take?
The build takes about as long as a new site. What adds time is the move: if your old site already brings calls from Google, every old address needs a redirect to its new page, and Google says a small to medium-sized site can take a few weeks for most pages to move over. Our Second Alarm includes the move; on its own it’s Search & Rescue, $500.
How long after launch will my website show up on Google?
Google says a new site can take a week or so to start being crawled, that crawling can take a few days to a few weeks, and that it can’t predict or guarantee when. Sending Google a sitemap and asking it to crawl the homepage helps it find the site. Showing up high for the searches you want takes longer, and nobody honest can promise a date.
Why do website projects take longer than quoted?
Usually the content: photos, wording and logins that arrive late. The firms in GoodFirms’ 2026 survey list content delays and growing scope among the hidden costs, and 49% named client revisions as something that pushes a project over budget. Have your photos, services, towns and logins ready on day one, and decide who approves the design.
What do I need to give my web designer?
Your logo, photos of your own jobs, the services you want calls for, the towns you work in, your license and insurance details if your trade shows them, your best reviews, your domain login, access to your Google Business Profile, and your old site’s login if you have one. To start with us, your name, business and phone are enough for the free mockup.
How long does Google Business Profile verification take?
Google says its review takes up to 5 business days after you finish the steps, rarely longer, and that it sometimes verifies a profile instantly. A postcard usually takes about 2 weeks to arrive and its code expires after 30 days. If video verification is offered, Google recommends it.
How long does it take to point a domain at a new website?
Usually a few hours. Netlify’s docs say the settings can take a full day to reach the whole internet, and to troubleshoot if it’s been more than 24 hours. You don’t have to move your domain to a new company to get a new site; it just gets pointed at it.
How much does it cost to build a contractor website?
With us, $1,000 for one page (The Attack Line), $2,500 for up to five pages (Working Fire) or $4,500 for 8 to 10 pages (Second Alarm), one time, after a free mockup; a rush launch is an extra fee. Our contractor website cost guide compares that with builders, freelancers and agencies.
Sources

Where these timings come from.

Checked November 5, 2026. The market figures are from GoodFirms’ 2026 survey of web development firms, read on its own page; the launch clocks are from Google’s and Netlify’s own help pages; our timings and prices are the ones on our homepage. If a company’s own page says something different from ours, theirs wins.

  1. GoodFirms: Website Development Cost 2026 (a survey of 300+ web development firms in 31 countries, April–May 2026)
  2. Search Console Help: Page indexing report (how long a new site takes to start being crawled)
  3. Google Search Central: Ask Google to recrawl your URLs
  4. Google Search Central: FAQ: Google Search crawling and indexing
  5. Google Search Central: Site moves and migrations
  6. Google Business Profile Help: Verify your business on Google
  7. Netlify Docs: Configure external DNS for a custom domain
  8. Salty Web Co: our plans, prices and timings
Keep reading

More straight answers.

Free mockup

Send us your business name. See your mockup in 3 days.

Your name, business and phone is all we need to start. We respond within one business day, and your free mockup is ready within 3 days. You pay nothing until you approve it.

Rather talk? Call or text (224) 225-9268.

Mockup requestNo cost · No obligation

What happens next: we respond within one business day, your free mockup is ready within 3 days, and you pay nothing until you approve the design.

By sending this, you agree we may contact you about your enquiry. We never sell your information — see our Privacy Policy.