Home › Website build time
How long does it take to build a website? A contractor’s timeline, week by week.
What a 2026 survey of web firms found, how long each size of site takes with us, what slows a build down, and when Google finds it after launch. Then put in your start date and see when yours would be live.
Updated November 5, 2026 · timings from a 2026 survey of 300+ web firms and Google’s own help pages, every source at the bottom
When would yours be live?
Pick the size of site and the day you’d ask, and say how many days you’d need to get us your photos and wording. It works out each date from our timings and Google’s.
How long each kind of site takes, theirs and ours.
In April and May 2026, GoodFirms asked 300+ web firms in 31 countries how long their builds take. Here are their most common answers next to our own timings, which start once we have your approval, photos and wording.
| What’s in it | Most common answer, GoodFirms 2026 | With us | |
|---|---|---|---|
| One page | Your services, job photos, a call button, a form, and your Business Profile set up | 2–4 weeks for a basic website (71% of firms) | About a week with 1 round of revisions: The Attack Line, $1,000. Or 24–72 hours on a rush, for an extra fee |
| Up to 5 pages | A page for each main service, your service areas, a gallery built to sell the work | 2–4 weeks for a basic site; 4–8 weeks for a mid-sized one (50% of firms) | About two weeks with 2 rounds: Working Fire, $2,500 |
| 8 to 10 pages, old site moved | A storm damage and insurance claim page, every old address redirected, Search Console set up | 4–8 weeks for a mid-sized site; 32% of firms said 8–16 | About three weeks with 3 rounds: Second Alarm, $4,500 |
| Online store | Products and their options, product photos, Google Shopping set up | 8–28 weeks for an ecommerce site | About three weeks with 2 rounds: Task Force, $3,500 |
GoodFirms surveyed firms in 31 countries, and each one scopes a “basic” site its own way, so read it as the usual range, not a rule. The firms building with AI site builders reported the quickest jobs: about 7 in 10 within two weeks. What each size costs is in our contractor website cost guide.
From your first call to Google finding it.
Here’s a one-page build with us, step by step. A bigger site adds a week or two to the build step; everything else is the same.
-
Day 1: you ask
Fill in the form or call. Your name, business and phone are enough to start, plus your current site’s link if you have one.
-
Within one business day: we call you back
We ask what you do, the towns you work in and what you want the phone to ring for.
-
By day 3: your free mockup
Your homepage, designed for your business, to look at on your own phone. You pay nothing until you approve it.
-
Your turn: approve it and send the details
Your logo, job photos, services and towns, reviews, and the logins to your domain and Business Profile. This is the step that sets the date, and it’s the one only you can do.
-
About a week: we build it
One page in about a week, with your round of revisions inside that time. Up to five pages takes about two weeks with 2 rounds; 8 to 10 pages, about three with 3.
-
Launch day: live on your domain
We point your domain at the new site; Netlify says that can take up to a full day to reach everyone. Then we send Google the sitemap and ask it to crawl the homepage, the first step Google recommends for a new site.
-
The weeks after: Google finds it
Google says a new site can take a week or so to start being crawled, and crawling can take a few days to a few weeks. Asking again doesn’t make it faster, and Google says it can’t predict or guarantee it.
Most delays aren’t the build. They’re waiting.
Six things that push a launch date back, and how to keep each one off yours.
Photos and wording
The firms in GoodFirms’ 2026 survey list content delays among the hidden costs: missing copy, images and legal text hold a project up, because nobody can build what doesn’t exist yet. Send your own job photos and your services on day one.
Too many people signing off
Every extra person who has to approve the design adds a round of waiting. Decide who signs off before it starts: in the same survey, 49% of the firms named client revisions as something that pushes a project over budget.
Logins nobody can find
The domain is in an old employee’s account, or the last designer kept the password. Find your domain login and your Business Profile access the day you ask, not the day before launch.
Adding pages halfway through
A new service page after the design is set is new work. GoodFirms puts growing scope at the top of the hidden costs its firms named. List everything you want at the start, even the pages for later.
Moving an old site
If your current site already brings calls from Google, every old address has to forward to its new page. Google says a small to medium-sized site can take a few weeks for most pages to move over, and suggests moving in a quieter stretch.
Waiting on a postcard
If your Business Profile isn’t verified yet, start now. Google says a postcard usually takes about 2 weeks to arrive and its code expires after 30 days, and its review takes up to 5 business days. If video verification is offered, Google recommends it.
Send these on day one and nothing waits on you.
You don’t need all of it to start: your name, business and phone are enough for the mockup. The rest sets your launch date.
- Your logo, the original file if you have it
- Photos of your own jobs, before and after if you have them
- The services you want calls for, and the ones you don’t
- The towns you work in
- Your license and insurance details, if your trade shows them
- Your best reviews, or the link to your Google profile
- Your domain login, wherever your web address is registered
- Access to your Business Profile, or the email that owns it
- Your old site’s login, if you’re moving from one
- Who signs off: one person who approves the design
Live isn’t the same as found. Here’s what comes after.
A site can be finished and still not show up. These clocks start at launch and belong to Google and your domain, not to us; here’s what each one’s own help pages say, and what helps.
| How long | What helps | |
|---|---|---|
| Your domain reaches the new site | Usually hours; Netlify says it can take a full day to reach the whole internet | Nothing on your end once we have your domain login |
| Google starts crawling a new site | A week or so, Google says; crawling can take a few days to a few weeks | A sitemap, and asking Google to crawl the homepage first; asking again won’t make it faster |
| Your old pages move to the new site | A few weeks for most pages on a small to medium-sized site, with rankings moving around meanwhile | A redirect from every old address, and a quieter stretch for the switch |
| Your Business Profile is verified | Google’s review takes up to 5 business days, and sometimes it’s instant; a postcard takes about 2 weeks to arrive first | Video verification, if Google offers it: Google recommends it |
| Showing up for the searches you want | No set time: Google says it can’t predict or guarantee when, or if, pages are crawled and indexed | A page for each service, reviews coming in, and a complete Business Profile |
Getting found after launch is its own job. Start with our Google Business Profile guide, or see what local SEO costs if you’d rather hand it off.
Build it yourself, or have it live in a week.
A website builder can be the right call if you have the evenings. Here’s what each way takes. Salty Web Co is firefighter-owned and builds for contractors.
A builder, done yourself
- Sign up and pick a template the same day
- Write every page and choose every photo yourself
- Set up the domain and your Business Profile yourself
- Your evenings, for as long as it takes
- A monthly plan; check the price once any intro offer ends
With Salty Web Co
- A reply within one business day and a free homepage mockup within 3 days
- The Attack Line, one page, $1,000, live in about a week
- Working Fire, up to 5 pages, $2,500, about two weeks; Second Alarm, 8–10 pages, $4,500, about three
- A one-page rush launch in 24–72 hours, for an extra fee
- Your domain pointed and your Business Profile set up for you, in English and Spanish
- You own your website, domain and data
Asked by contractors, answered straight.
How long does it take to build a website?
How long does a contractor website take to build?
Can a website be built in 24 hours?
How long does a website redesign take?
How long after launch will my website show up on Google?
Why do website projects take longer than quoted?
What do I need to give my web designer?
How long does Google Business Profile verification take?
How long does it take to point a domain at a new website?
How much does it cost to build a contractor website?
Where these timings come from.
Checked November 5, 2026. The market figures are from GoodFirms’ 2026 survey of web development firms, read on its own page; the launch clocks are from Google’s and Netlify’s own help pages; our timings and prices are the ones on our homepage. If a company’s own page says something different from ours, theirs wins.
- GoodFirms: Website Development Cost 2026 (a survey of 300+ web development firms in 31 countries, April–May 2026)
- Search Console Help: Page indexing report (how long a new site takes to start being crawled)
- Google Search Central: Ask Google to recrawl your URLs
- Google Search Central: FAQ: Google Search crawling and indexing
- Google Search Central: Site moves and migrations
- Google Business Profile Help: Verify your business on Google
- Netlify Docs: Configure external DNS for a custom domain
- Salty Web Co: our plans, prices and timings
More straight answers.
Or see finished sites: our work and how we built Creative Concrete’s.
Send us your business name. See your mockup in 3 days.
Your name, business and phone is all we need to start. We respond within one business day, and your free mockup is ready within 3 days. You pay nothing until you approve it.
Rather talk? Call or text (224) 225-9268.